Client story

Fit-out of a medical facility

Size

500 sqm

Duration

5 months

Challenge

As part of the work for the tenants of Centrum Orląt - building refurbished by Tetris - we were asked to fit-out a fertility treatment clinic.

The fit-out of a medical facility presented slightly different challenges to the contractor than office spaces. One of these was the equipment, which had to be properly soundproofed. Specific requirements also applied to the finishing materials, which had to be suitable for cleaning with disinfectants, etc.

Fit-out of a medical facility

Solution

To meet the Tenant's needs, a power generator located on the roof of the building was installed to provide backup power for selected equipment in the event of a power outage.

For any noisy equipment, Tetris built soundproofing and enclosures.