Client story

Hotel renovation works in an occupied site

Size

4600 sqm

Duration

5 months

Approx.

189 keys

Challenge

Tétris was commissioned by Radisson Hotel Group, a world-renowned American hotel group managing a vast portfolio of establishments, for a major project: conducting the complete renovation works of the Radisson Blu, located in the Old Port of Marseille.

This colossal project encompassed the complete transformation of 189 rooms and the hotel lobby, covering a total area of 4,600 square meters.

The main challenge of this project lay in its logistical complexity. Indeed, Tétris had to successfully carry out this large-scale renovation in an occupied site, while adhering to a particularly tight schedule of 5 months for the accommodation section. This time constraint demanded precise coordination and optimal efficiency at every stage of the process.

The lobby, the true showcase of the hotel and the first point of contact with guests, received special attention. In this strategic space, the Tétris team deployed all its expertise in interior design. Every aspect of the renovation was meticulously studied, from coverings to lighting, including custom fittings and technical installations. Tétris's expertise was also demonstrated in the harmonious integration of furniture selected by the client, ensuring perfect coherence with all the work carried out.

Solution

To meet this space planning challenge, Tétris developed and implemented a rigorous strategy, structured around several key axes.

First, a methodical phasing was established. The project was divided into five distinct work phases, allowing for a systematic approach and optimal resource allocation. This segmentation facilitated site management and minimized disruptions for hotel guests and staff.

Next, Tétris implemented a continuous improvement process. At the end of each phase, the methodology underwent thorough review, improvement, and optimization. This approach increased efficiency throughout the project by capitalizing on feedback and experience.

Close collaboration with partner companies played a crucial role in the project's success. Tétris established a relationship of mutual trust, fostering optimal synergy between the various teams involved. This collaborative approach helped overcome the challenges inherent to a project of this scale.

The total commitment of Tétris teams and those of partners was a determining factor. All demonstrated exceptional dedication, working hand in hand to achieve set objectives, despite time constraints and project complexity.

Finally, rigorous management was put in place, with constant monitoring of work progress and rapid adaptability to unforeseen circumstances. This constant vigilance ensured compliance with the project's tight deadlines.

Thanks to this structured approach and Tétris' expertise in space planning, the project was completed within the allotted timeframe, strictly adhering to the initially set 5-month deadline. The successful renovation of 189 rooms and meticulous transformation of the lobby modernized the establishment while minimizing disruptions for guests and staff.

This exemplary achievement highlights Tétris' expertise in managing complex hotel renovation projects, particularly in occupied site situations and within optimized timeframes. The success of this project consolidates Tétris' position as a reference partner for large-scale hotel renovations, capable of executing ambitious projects while maintaining impeccable quality standards.

We'd love to hear from you

Get in Touch
^ array:48 [
  "__path" => "/nas/content/live/tetrisdb/wp-content/uploads/cache/dae4c276d8a3ca47269d8943e641a0ff92e5e45a.php"
  "__data" => array:33 [
    "__env" => Illuminate\View\Factory {#2898
      #engines: Illuminate\View\Engines\EngineResolver {#2890
        #resolvers: array:3 [
          "file" => Closure() {#2891
            class: "Illuminate\View\ViewServiceProvider"
            this: Illuminate\View\ViewServiceProvider {#2885 …}
          }
          "php" => Closure() {#2892
            class: "Illuminate\View\ViewServiceProvider"
            this: Illuminate\View\ViewServiceProvider {#2885 …}
          }
          "blade" => Closure() {#2893
            class: "Illuminate\View\ViewServiceProvider"
            this: Illuminate\View\ViewServiceProvider {#2885 …}
          }
        ]
        #resolved: array:1 [
          "blade" => Illuminate\View\Engines\CompilerEngine {#5120
            #files: Illuminate\Filesystem\Filesystem {#2895}
            #compiler: Illuminate\View\Compilers\BladeCompiler {#2899
              #files: Illuminate\Filesystem\Filesystem {#2895}
              #cachePath: "/nas/content/live/tetrisdb/wp-content/uploads/cache"
              #extensions: []
              #customDirectives: array:4 [
                "asset" => array:2 [
                  0 => Magina\StarterTheme\Template\Directives {#2528}
                  1 => "asset"
                ]
                "shortcode" => array:2 [
                  0 => Magina\StarterTheme\Template\Directives {#2528}
                  1 => "shortcode"
                ]
                "debug" => array:2 [
                  0 => Magina\StarterTheme\Template\Directives {#2528}
                  1 => "debug"
                ]
                "svg" => array:2 [
                  0 => Magina\StarterTheme\Template\Directives {#2528}
                  1 => "svg"
                ]
              ]
              #conditions: []
              #precompilers: []
              #path: null
              #compilers: array:3 [
                0 => "Extensions"
                1 => "Statements"
                2 => "Echos"
              ]
              #rawTags: array:2 [
                0 => "{!!"
                1 => "!!}"
              ]
              #contentTags: array:2 [
                0 => "{{"
                1 => "}}"
              ]
              #escapedTags: array:2 [
                0 => "{{{"
                1 => "}}}"
              ]
              #echoFormat: "e(%s)"
              #footer: []
              #rawBlocks: []
              #classComponentAliases: array:1 [
                "dynamic-component" => "Illuminate\View\DynamicComponent"
              ]
              #classComponentNamespaces: []
              #compilesComponentTags: true
              #firstCaseInSwitch: true
              #echoHandlers: []
              -encodingOptions: 15
              #lastSection: null
              #forElseCounter: 0
            }
            #lastCompiled: array:2 [
              0 => "/nas/content/live/tetrisdb/wp-content/themes/tetris/resources/views/single.blade.php"
              1 => "/nas/content/live/tetrisdb/wp-content/themes/tetris/resources/views/content/case_study/single.blade.php"
            ]
          }
        ]
      }
      #finder: Illuminate\View\FileViewFinder {#2894
        #files: Illuminate\Filesystem\Filesystem {#2895}
        #paths: array:1 [
          0 => "/nas/content/live/tetrisdb/wp-content/themes/tetris/resources/views"
        ]
        #views: array:4 [
          "single" => "/nas/content/live/tetrisdb/wp-content/themes/tetris/resources/views/single.blade.php"
          "content.case_study.single" => "/nas/content/live/tetrisdb/wp-content/themes/tetris/resources/views/content/case_study/single.blade.php"
          "content.case_study.loop" => "/nas/content/live/tetrisdb/wp-content/themes/tetris/resources/views/content/case_study/loop.blade.php"
          "content.case_study.contact-cta" => "/nas/content/live/tetrisdb/wp-content/themes/tetris/resources/views/content/case_study/contact-cta.blade.php"
        ]
        #hints: []
        #extensions: array:4 [
          0 => "blade.php"
          1 => "php"
          2 => "css"
          3 => "html"
        ]
      }
      #events: Illuminate\Events\Dispatcher {#2896
        #container: Illuminate\Container\Container {#2897
          #resolved: []
          #bindings: []
          #methodBindings: []
          #instances: []
          #scopedInstances: []
          #aliases: []
          #abstractAliases: []
          #extenders: []
          #tags: []
          #buildStack: []
          #with: []
          +contextual: []
          #reboundCallbacks: []
          #globalBeforeResolvingCallbacks: []
          #globalResolvingCallbacks: []
          #globalAfterResolvingCallbacks: []
          #beforeResolvingCallbacks: []
          #resolvingCallbacks: []
          #afterResolvingCallbacks: []
        }
        #listeners: []
        #wildcards: []
        #wildcardsCache: array:8 [
          "creating: single" => []
          "composing: single" => []
          "creating: content.case_study.single" => []
          "composing: content.case_study.single" => []
          "creating: content.case_study.loop" => []
          "composing: content.case_study.loop" => []
          "creating: content.case_study.contact-cta" => []
          "composing: content.case_study.contact-cta" => []
        ]
        #queueResolver: null
      }
      #container: Illuminate\Container\Container {#2881
        #resolved: array:7 [
          "view.engine.resolver" => true
          "files" => true
          "config" => true
          "view.finder" => true
          "events" => true
          "view" => true
          "blade.compiler" => true
        ]
        #bindings: array:7 [
          "files" => array:2 [
            "concrete" => Closure() {#2882
              class: "Jenssegers\Blade\Blade"
              this: Jenssegers\Blade\Blade {#2880 …}
            }
            "shared" => true
          ]
          "events" => array:2 [
            "concrete" => Closure() {#2883
              class: "Jenssegers\Blade\Blade"
              this: Jenssegers\Blade\Blade {#2880 …}
            }
            "shared" => true
          ]
          "config" => array:2 [
            "concrete" => Closure() {#2884
              class: "Jenssegers\Blade\Blade"
              this: Jenssegers\Blade\Blade {#2880 …}
              use: {
                $viewPaths: array:1 [
                  0 => "/nas/content/live/tetrisdb/wp-content/themes/tetris/resources/views"
                ]
                $cachePath: "/nas/content/live/tetrisdb/wp-content/uploads/cache"
              }
            }
            "shared" => true
          ]
          "view" => array:2 [
            "concrete" => Closure($app) {#2886
              class: "Illuminate\View\ViewServiceProvider"
              this: Illuminate\View\ViewServiceProvider {#2885 …}
            }
            "shared" => true
          ]
          "view.finder" => array:2 [
            "concrete" => Closure($app) {#2887
              class: "Illuminate\View\ViewServiceProvider"
              this: Illuminate\View\ViewServiceProvider {#2885 …}
            }
            "shared" => false
          ]
          "blade.compiler" => array:2 [
            "concrete" => Closure($app) {#2888
              class: "Illuminate\View\ViewServiceProvider"
              this: Illuminate\View\ViewServiceProvider {#2885 …}
            }
            "shared" => true
          ]
          "view.engine.resolver" => array:2 [
            "concrete" => Closure() {#2889
              class: "Illuminate\View\ViewServiceProvider"
              this: Illuminate\View\ViewServiceProvider {#2885 …}
            }
            "shared" => true
          ]
        ]
        #methodBindings: []
        #instances: array:6 [
          "view.engine.resolver" => Illuminate\View\Engines\EngineResolver {#2890}
          "files" => Illuminate\Filesystem\Filesystem {#2895}
          "config" => array:2 [
            "view.paths" => array:1 [
              0 => "/nas/content/live/tetrisdb/wp-content/themes/tetris/resources/views"
            ]
            "view.compiled" => "/nas/content/live/tetrisdb/wp-content/uploads/cache"
          ]
          "events" => Illuminate\Events\Dispatcher {#2896}
          "view" => Illuminate\View\Factory {#2898}
          "blade.compiler" => Illuminate\View\Compilers\BladeCompiler {#2899}
        ]
        #scopedInstances: []
        #aliases: []
        #abstractAliases: []
        #extenders: []
        #tags: []
        #buildStack: []
        #with: []
        +contextual: []
        #reboundCallbacks: []
        #globalBeforeResolvingCallbacks: []
        #globalResolvingCallbacks: []
        #globalAfterResolvingCallbacks: []
        #beforeResolvingCallbacks: []
        #resolvingCallbacks: []
        #afterResolvingCallbacks: []
      }
      #shared: array:2 [
        "__env" => Illuminate\View\Factory {#2898}
        "app" => Illuminate\Container\Container {#2881}
      ]
      #extensions: array:4 [
        "blade.php" => "blade"
        "php" => "php"
        "css" => "file"
        "html" => "file"
      ]
      #composers: []
      #renderCount: 2
      #renderedOnce: []
      #componentStack: []
      #componentData: []
      #currentComponentData: []
      #slots: []
      #slotStack: []
      #sections: []
      #sectionStack: array:1 [
        0 => "content"
      ]
      #loopsStack: []
      #pushes: []
      #prepends: []
      #pushStack: []
      #translationReplacements: []
    }
    "app" => Illuminate\Container\Container {#2881}
    "override" => "single"
    "gdpr_prefs" => []
    "contact_url" => "https://www.tetris-db.com/en/contact-us/"
    "contact_phones" => array:14 [
      "Belgium" => array:3 [
        "code" => "be"
        "flag" => "https://www.tetris-db.com/wp-content/polylang/fr_BE.svg"
        "phone" => "+3225502617"
      ]
      "Brazil" => array:3 [
        "code" => "br"
        "flag" => "https://www.tetris-db.com/wp-content/polylang/pt_BR.svg"
        "phone" => "+55114949-6591"
      ]
      "Dubai" => array:3 [
        "code" => "ae"
        "flag" => "https://www.tetris-db.com/wp-content/polylang/ae.svg"
        "phone" => "+97144266999"
      ]
      "France" => array:3 [
        "code" => "fr"
        "flag" => "https://www.tetris-db.com/wp-content/polylang/fr_FR.svg"
        "phone" => "+33149003250"
      ]
      "Germany" => array:3 [
        "code" => "de"
        "flag" => "https://www.tetris-db.com/wp-content/polylang/de_DE.svg"
        "phone" => "+496920032000"
      ]
      "Italy" => array:3 [
        "code" => "it"
        "flag" => "https://www.tetris-db.com/wp-content/polylang/it_IT.svg"
        "phone" => "+390249536400"
      ]
      "Luxembourg" => array:3 [
        "code" => "lu"
        "flag" => "https://www.tetris-db.com/wp-content/polylang/fr_LU.svg"
        "phone" => "+35246454034"
      ]
      "Netherlands" => array:3 [
        "code" => "nl"
        "flag" => "https://www.tetris-db.com/wp-content/polylang/nl_NL.svg"
        "phone" => "+31205405405"
      ]
      "Poland" => array:3 [
        "code" => "pl"
        "flag" => "https://www.tetris-db.com/wp-content/polylang/pl_PL.svg"
        "phone" => "+48221670000"
      ]
      "Portugal" => array:3 [
        "code" => "pt"
        "flag" => "https://www.tetris-db.com/wp-content/polylang/pt_PT.svg"
        "phone" => "+351213583222"
      ]
      "South Africa" => array:3 [
        "code" => "za"
        "flag" => "https://www.tetris-db.com/wp-content/polylang/en_ZA.svg"
        "phone" => "+27105908355"
      ]
      "Spain" => array:3 [
        "code" => "es"
        "flag" => "https://www.tetris-db.com/wp-content/polylang/es_ES.svg"
        "phone" => "+34662409255"
      ]
      "Switzerland" => array:3 [
        "code" => "ch"
        "flag" => "https://www.tetris-db.com/wp-content/polylang/fr_CH.svg"
        "phone" => "+41227500680"
      ]
      "United Kingdom" => array:3 [
        "code" => "uk"
        "flag" => "https://www.tetris-db.com/wp-content/polylang/en_GB.svg"
        "phone" => "+442074934933"
      ]
    ]
    "best_contact_phone" => array:4 [
      "code" => "be"
      "flag" => "https://www.tetris-db.com/wp-content/polylang/fr_BE.svg"
      "name" => "Belgium"
      "phone" => "+3225502617"
    ]
    "show_intro" => false
    "popup" => false
    "display_breadcrumbs" => true
    "display_sidebar" => false
    "status" => "publish"
    "asset" => WP_Term {#5109
      +term_id: 106
      +name: "Hotel"
      +slug: "hotel"
      +term_group: 0
      +term_taxonomy_id: 106
      +taxonomy: "asset"
      +description: "<p>Hotels can be a transformative space whether for business sojourns, creative pursuits or a once-in-a-lifetime experience – and as a hotelier, it’s your unique concept that attracts discerning guests with different needs, aspirations and lifestyles.</p>"
      +parent: 0
      +count: 0
      +filter: "raw"
    }
    "client" => WP_Term {#4887
      +term_id: 8341
      +name: "Radisson Blu"
      +slug: "radisson-blu"
      +term_group: 0
      +term_taxonomy_id: 8341
      +taxonomy: "client"
      +description: ""
      +parent: 0
      +count: 3
      +filter: "raw"
    }
    "industries" => array:1 [
      0 => WP_Term {#5105
        +term_id: 152
        +name: "Hospitality"
        +slug: "hospitality"
        +term_group: 0
        +term_taxonomy_id: 152
        +taxonomy: "industry"
        +description: ""
        +parent: 0
        +count: 42
        +filter: "raw"
      }
    ]
    "services" => array:1 [
      30 => WP_Term {#5094
        +term_id: 98
        +name: "Fit-out services"
        +slug: "fit-out-services"
        +term_group: 0
        +term_taxonomy_id: 98
        +taxonomy: "service"
        +description: "Work with Tétris fit-out services to translate your design vision into a beautiful, functional built environment that meets modern workspace needs."
        +parent: 0
        +count: 0
        +filter: "raw"
        +"order": "30"
      }
    ]
    "tags" => []
    "area" => "4600 sqm"
    "description" => array:2 [
      "headings" => array:2 [
        "challenge" => "Challenge"
        "solution" => "Solution"
      ]
      "texts" => array:2 [
        "challenge" => """
          \r\n
          <p>Tétris was commissioned by <a href="https://www.radissonhotels.com/en-us/" target="_blank" rel="noopener">Radisson Hotel Group</a>, a world-renowned American hotel group managing a vast portfolio of establishments, for a major project: conducting the complete renovation works of the Radisson Blu, located in the Old Port of Marseille.</p>\r\n
          <p>This colossal project encompassed the complete transformation of 189 rooms and the hotel lobby, covering a total area of 4,600 square meters.</p>\r\n
          <p>The main challenge of this project lay in its logistical complexity. Indeed, Tétris had to successfully carry out this large-scale renovation in an occupied site, while adhering to a particularly tight schedule of 5 months for the accommodation section. This time constraint demanded precise coordination and optimal efficiency at every stage of the process.</p>\r\n
          <p>The lobby, the true showcase of the hotel and the first point of contact with guests, received special attention. In this strategic space, the Tétris team deployed all its expertise in interior design. Every aspect of the renovation was meticulously studied, from coverings to lighting, including custom fittings and technical installations. Tétris's expertise was also demonstrated in the harmonious integration of furniture selected by the client, ensuring perfect coherence with all the work carried out.</p>\r\n
          """
        "solution" => """
          \r\n
          <p>To meet this space planning challenge, Tétris developed and implemented a rigorous strategy, structured around several key axes.</p>\r\n
          <p>First, a methodical phasing was established. The project was divided into five distinct work phases, allowing for a systematic approach and optimal resource allocation. This segmentation facilitated site management and minimized disruptions for hotel guests and staff.</p>\r\n
          <p>Next, Tétris implemented a continuous improvement process. At the end of each phase, the methodology underwent thorough review, improvement, and optimization. This approach increased efficiency throughout the project by capitalizing on feedback and experience.</p>\r\n
          <p>Close collaboration with partner companies played a crucial role in the project's success. Tétris established a relationship of mutual trust, fostering optimal synergy between the various teams involved. This collaborative approach helped overcome the challenges inherent to a project of this scale.</p>\r\n
          <p>The total commitment of Tétris teams and those of partners was a determining factor. All demonstrated exceptional dedication, working hand in hand to achieve set objectives, despite time constraints and project complexity.</p>\r\n
          <p>Finally, rigorous management was put in place, with constant monitoring of work progress and rapid adaptability to unforeseen circumstances. This constant vigilance ensured compliance with the project's tight deadlines.</p>\r\n
          <p>Thanks to this structured approach and Tétris' expertise in space planning, the project was completed within the allotted timeframe, strictly adhering to the initially set 5-month deadline. The successful renovation of 189 rooms and meticulous transformation of the lobby modernized the establishment while minimizing disruptions for guests and staff.</p>\r\n
          <p>This exemplary achievement highlights Tétris' expertise in managing complex hotel renovation projects, particularly in occupied site situations and within optimized timeframes. The success of this project consolidates Tétris' position as a reference partner for large-scale hotel renovations, capable of executing ambitious projects while maintaining impeccable quality standards.</p>
          """
      ]
    ]
    "table_of_contents" => array:2 [
      "challenge" => "Challenge\n"
      "solution" => "Solution\n"
    ]
    "contents" => array:2 [
      0 => """
        <h2 id="challenge" class="tab">Challenge</h2>\r\n
        <p>Tétris was commissioned by <a href="https://www.radissonhotels.com/en-us/" target="_blank" rel="noopener">Radisson Hotel Group</a>, a world-renowned American hotel group managing a vast portfolio of establishments, for a major project: conducting the complete renovation works of the Radisson Blu, located in the Old Port of Marseille.</p>\r\n
        <p>This colossal project encompassed the complete transformation of 189 rooms and the hotel lobby, covering a total area of 4,600 square meters.</p>\r\n
        <p>The main challenge of this project lay in its logistical complexity. Indeed, Tétris had to successfully carry out this large-scale renovation in an occupied site, while adhering to a particularly tight schedule of 5 months for the accommodation section. This time constraint demanded precise coordination and optimal efficiency at every stage of the process.</p>\r\n
        <p>The lobby, the true showcase of the hotel and the first point of contact with guests, received special attention. In this strategic space, the Tétris team deployed all its expertise in interior design. Every aspect of the renovation was meticulously studied, from coverings to lighting, including custom fittings and technical installations. Tétris's expertise was also demonstrated in the harmonious integration of furniture selected by the client, ensuring perfect coherence with all the work carried out.</p>\r\n
        """
      1 => """
        <h2 id="solution" class="tab">Solution</h2>\r\n
        <p>To meet this space planning challenge, Tétris developed and implemented a rigorous strategy, structured around several key axes.</p>\r\n
        <p>First, a methodical phasing was established. The project was divided into five distinct work phases, allowing for a systematic approach and optimal resource allocation. This segmentation facilitated site management and minimized disruptions for hotel guests and staff.</p>\r\n
        <p>Next, Tétris implemented a continuous improvement process. At the end of each phase, the methodology underwent thorough review, improvement, and optimization. This approach increased efficiency throughout the project by capitalizing on feedback and experience.</p>\r\n
        <p>Close collaboration with partner companies played a crucial role in the project's success. Tétris established a relationship of mutual trust, fostering optimal synergy between the various teams involved. This collaborative approach helped overcome the challenges inherent to a project of this scale.</p>\r\n
        <p>The total commitment of Tétris teams and those of partners was a determining factor. All demonstrated exceptional dedication, working hand in hand to achieve set objectives, despite time constraints and project complexity.</p>\r\n
        <p>Finally, rigorous management was put in place, with constant monitoring of work progress and rapid adaptability to unforeseen circumstances. This constant vigilance ensured compliance with the project's tight deadlines.</p>\r\n
        <p>Thanks to this structured approach and Tétris' expertise in space planning, the project was completed within the allotted timeframe, strictly adhering to the initially set 5-month deadline. The successful renovation of 189 rooms and meticulous transformation of the lobby modernized the establishment while minimizing disruptions for guests and staff.</p>\r\n
        <p>This exemplary achievement highlights Tétris' expertise in managing complex hotel renovation projects, particularly in occupied site situations and within optimized timeframes. The success of this project consolidates Tétris' position as a reference partner for large-scale hotel renovations, capable of executing ambitious projects while maintaining impeccable quality standards.</p>
        """
    ]
    "duration" => "5 months"
    "workplaces" => "189 keys"
    "testimonial" => ""
    "img_gallery" => array:16 [
      41840 => "https://www.tetris-db.com/wp-content/uploads/2025/06/tetris-db-radisson-blu-france-38741-37.jpg"
      41834 => "https://www.tetris-db.com/wp-content/uploads/2025/06/tetris-db-radisson-blu-france-38741-25.jpg"
      41837 => "https://www.tetris-db.com/wp-content/uploads/2025/06/tetris-db-radisson-blu-france-38741-31.jpg"
      41832 => "https://www.tetris-db.com/wp-content/uploads/2025/06/tetris-db-radisson-blu-france-38741-11.jpg"
      41843 => "https://www.tetris-db.com/wp-content/uploads/2025/06/tetris-db-radisson-blu-france-38741-42.jpg"
      41847 => "https://www.tetris-db.com/wp-content/uploads/2025/06/tetris-db-radisson-blu-france-38741-48.jpg"
      41846 => "https://www.tetris-db.com/wp-content/uploads/2025/06/tetris-db-radisson-blu-france-38741-47.jpg"
      41844 => "https://www.tetris-db.com/wp-content/uploads/2025/06/tetris-db-radisson-blu-france-38741-43.jpg"
      41845 => "https://www.tetris-db.com/wp-content/uploads/2025/06/tetris-db-radisson-blu-france-38741-45.jpg"
      41842 => "https://www.tetris-db.com/wp-content/uploads/2025/06/tetris-db-radisson-blu-france-38741-40.jpg"
      41841 => "https://www.tetris-db.com/wp-content/uploads/2025/06/tetris-db-radisson-blu-france-38741-38.jpg"
      41836 => "https://www.tetris-db.com/wp-content/uploads/2025/06/tetris-db-radisson-blu-france-38741-30.jpg"
      41838 => "https://www.tetris-db.com/wp-content/uploads/2025/06/tetris-db-radisson-blu-france-38741-33.jpg"
      41835 => "https://www.tetris-db.com/wp-content/uploads/2025/06/tetris-db-radisson-blu-france-38741-29.jpg"
      41839 => "https://www.tetris-db.com/wp-content/uploads/2025/06/tetris-db-radisson-blu-france-38741-36.jpg"
      41833 => "https://www.tetris-db.com/wp-content/uploads/2025/06/tetris-db-radisson-blu-france-38741-24.jpg"
    ]
    "vid_gallery" => ""
    "virtual_visit" => false
    "gallery_pos" => ""
    "loc_country_code" => "fr"
    "loc_country" => "France"
    "loc_city" => "Marseille"
    "loc_coords" => array:1 [
      0 => "43.2933908;5.3709635"
    ]
    "related_posts" => WP_Query {#5115
      +query: array:8 [
        "post_type" => "case_study"
        "post_status" => "publish"
        "posts_per_page" => 3
        "post__not_in" => array:1 [
          0 => 41830
        ]
        "meta_query" => array:1 [
          0 => array:3 [
            "key" => "_bc_location"
            "value" => "fr"
            "compare" => "="
          ]
        ]
        "tax_query" => array:1 [
          0 => array:3 [
            "taxonomy" => "asset"
            "field" => "slug"
            "terms" => "hotel-fit-out"
          ]
        ]
        "orderby" => "rand"
        "order" => "DESC"
      ]
      +query_vars: array:71 [
        "post_type" => "case_study"
        "post_status" => "publish"
        "posts_per_page" => 3
        "post__not_in" => array:1 [
          0 => 41830
        ]
        "meta_query" => array:1 [
          0 => array:3 [
            "key" => "_bc_location"
            "value" => "fr"
            "compare" => "="
          ]
        ]
        "tax_query" => array:1 [
          0 => array:3 [
            "taxonomy" => "asset"
            "field" => "slug"
            "terms" => array:1 [
              0 => "hotel-fit-out"
            ]
          ]
        ]
        "orderby" => "rand"
        "order" => ""
        "error" => ""
        "m" => ""
        "p" => 0
        "post_parent" => ""
        "subpost" => ""
        "subpost_id" => ""
        "attachment" => ""
        "attachment_id" => 0
        "name" => ""
        "pagename" => ""
        "page_id" => 0
        "second" => ""
        "minute" => ""
        "hour" => ""
        "day" => 0
        "monthnum" => 0
        "year" => 0
        "w" => 0
        "category_name" => ""
        "tag" => ""
        "cat" => ""
        "tag_id" => ""
        "author" => ""
        "author_name" => ""
        "feed" => ""
        "tb" => ""
        "paged" => 0
        "meta_key" => ""
        "meta_value" => ""
        "preview" => ""
        "s" => ""
        "sentence" => ""
        "title" => ""
        "fields" => ""
        "menu_order" => ""
        "embed" => ""
        "category__in" => []
        "category__not_in" => []
        "category__and" => []
        "post__in" => []
        "post_name__in" => []
        "tag__in" => []
        "tag__not_in" => []
        "tag__and" => []
        "tag_slug__in" => []
        "tag_slug__and" => []
        "post_parent__in" => []
        "post_parent__not_in" => []
        "author__in" => []
        "author__not_in" => []
        "search_columns" => []
        "update_post_term_cache" => true
        "ignore_sticky_posts" => false
        "suppress_filters" => false
        "cache_results" => true
        "update_menu_item_cache" => false
        "lazy_load_term_meta" => true
        "update_post_meta_cache" => true
        "nopaging" => false
        "comments_per_page" => "50"
        "no_found_rows" => false
        "taxonomy" => "asset"
        "term" => "hotel-fit-out"
      ]
      +tax_query: WP_Tax_Query {#5112
        +queries: array:1 [
          0 => array:5 [
            "taxonomy" => "asset"
            "terms" => array:1 [
              0 => "hotel-fit-out"
            ]
            "field" => "slug"
            "operator" => "IN"
            "include_children" => true
          ]
        ]
        +relation: "AND"
        #table_aliases: array:1 [
          0 => "wp_term_relationships"
        ]
        +queried_terms: array:1 [
          "asset" => array:2 [
            "terms" => array:1 [
              0 => "hotel-fit-out"
            ]
            "field" => "slug"
          ]
        ]
        +primary_table: "wp_posts"
        +primary_id_column: "ID"
      }
      +meta_query: WP_Meta_Query {#5117
        +queries: array:2 [
          0 => array:3 [
            "key" => "_bc_location"
            "value" => "fr"
            "compare" => "="
          ]
          "relation" => "OR"
        ]
        +relation: "AND"
        +meta_table: "wp_postmeta"
        +meta_id_column: "post_id"
        +primary_table: "wp_posts"
        +primary_id_column: "ID"
        #table_aliases: array:1 [
          0 => "wp_postmeta"
        ]
        #clauses: array:1 [
          "wp_postmeta" => array:6 [
            "key" => "_bc_location"
            "value" => "fr"
            "compare" => "="
            "compare_key" => "="
            "alias" => "wp_postmeta"
            "cast" => "CHAR"
          ]
        ]
        #has_or_relation: false
      }
      +date_query: false
      +request: """
        SELECT SQL_CALC_FOUND_ROWS  wp_posts.ID\n
        \t\t\t\t\t FROM wp_posts  LEFT JOIN wp_term_relationships ON (wp_posts.ID = wp_term_relationships.object_id) INNER JOIN wp_postmeta ON ( wp_posts.ID = wp_postmeta.post_id )\n
        \t\t\t\t\t WHERE 1=1  AND wp_posts.ID NOT IN (41830) AND ( \n
          wp_term_relationships.term_taxonomy_id IN (284)\n
        ) AND ( \n
          ( wp_postmeta.meta_key = '_bc_location' AND wp_postmeta.meta_value = 'fr' )\n
        ) AND wp_posts.post_type = 'case_study' AND ((wp_posts.post_status = 'publish'))\n
        \t\t\t\t\t GROUP BY wp_posts.ID\n
        \t\t\t\t\t ORDER BY RAND()\n
        \t\t\t\t\t LIMIT 0, 3
        """
      +posts: array:3 [
        0 => WP_Post {#5118
          +ID: 4982
          +post_author: "2"
          +post_date: "2019-01-29 18:35:46"
          +post_date_gmt: "2019-01-29 17:35:46"
          +post_content: """
            <p class="p1">The hotel on La Croisette, famous for its celebrity guests, wanted a facelift and chose Tétris for this task.</p>\r\n
            <p class="p1">A sizeable challenge tackled by Tétris: 9 months were enough to refurbish 254 rooms, 23 suites, 15 meeting rooms, as well as the public areas (lobby, reception, restaurant, terrace and garden).</p>\r\n
            <p class="p1">The challenge was to adapt and deploy an architectural concept designed by the firm Pierre-Yves Rochon with tight deadlines.</p>\r\n
            <p class="p1">The 20,000 m² at Le Martinez were subject to a bespoke refurbishment, retaining its spirit and following the designer’s brief. Noble materials such as marble, staff and gilding were used to underline the elegance and grandeur of the location. The challenge was also to cleverly rearrange public areas to free up space.</p>\r\n
            <p class="p1">The outside of the hotel was also refurbished: a new bar was created outside, as well as a garden with a sea view. The restaurant was opened up to the outside, and a panoramic lift was added.</p>
            """
          +post_title: "Refurbishment of an iconic palace on the Riviera"
          +post_excerpt: "Discover how Tétris helped refurbish the iconic 5-star hotel Le Martinez in Cannes."
          +post_status: "publish"
          +comment_status: "closed"
          +ping_status: "closed"
          +post_password: ""
          +post_name: "refurbishment-of-an-iconic-palace-on-the-riviera"
          +to_ping: ""
          +pinged: ""
          +post_modified: "2021-06-29 19:08:57"
          +post_modified_gmt: "2021-06-29 19:08:57"
          +post_content_filtered: ""
          +post_parent: 0
          +guid: "https://tetris-dev.ontest.net/case_study/refurbishment-of-an-iconic-palace-on-the-riviera/"
          +menu_order: 0
          +post_type: "case_study"
          +post_mime_type: ""
          +comment_count: "0"
          +filter: "raw"
        }
        1 => WP_Post {#5111
          +ID: 7491
          +post_author: "2"
          +post_date: "2020-10-20 10:59:13"
          +post_date_gmt: "2020-10-20 08:59:13"
          +post_content: """
            <p>Colonies, one of the French coliving leader, offers flexible urban accommodation, combining the best of design, technology and friendliness for a new living experience. The living room, the kitchen, the laundry, the home cinema are common areas for all residents in a "flatsharing" spirit. However, each tenant has their own privacy: the individual accommodations have a bedroom, a bathroom, a toilet and sometimes a kitchenette.</p>\r\n
            <p>In this context, Tétris carried out its first coliving project, by managing for Colonies the works of "Mustang", a house of character in Marcq-en-Baroeul: plumbing works, wall coverings and floors, electricity, interior joinery. The works were completed in three and a half months.</p>
            """
          +post_title: "Coliving fit-out in Lille Region"
          +post_excerpt: "Colonies, one of the French coliving leader, calls on Tétris for the fitting out of a new house near Lille."
          +post_status: "publish"
          +comment_status: "closed"
          +ping_status: "closed"
          +post_password: ""
          +post_name: "coliving-fit-out-in-lille-region"
          +to_ping: ""
          +pinged: ""
          +post_modified: "2021-10-13 13:28:58"
          +post_modified_gmt: "2021-10-13 13:28:58"
          +post_content_filtered: ""
          +post_parent: 0
          +guid: "https://tetris-dev.ontest.net/case_study/coliving-fit-out-in-lille-region/"
          +menu_order: 0
          +post_type: "case_study"
          +post_mime_type: ""
          +comment_count: "0"
          +filter: "raw"
        }
        2 => WP_Post {#5110
          +ID: 8423
          +post_author: "2"
          +post_date: "2021-05-20 00:11:16"
          +post_date_gmt: "2021-05-20 00:11:16"
          +post_content: """
            <p>The Republik Hotel offers a new chic address a few steps from the Hôtel-Dieu and Place Bellecour, in the heart of the dynamic center of Lyon.</p>\r\n
            <p>Committed to a renovation program of its entire hotel of 38 rooms and its common areas, our client has chosen Tétris to finalize the design created by the Parisian agency "les deux ailes architectes" and carry out the first phase of the turnkey work in 2020.</p>\r\n
            <p>The Républik Hotel welcomes you in a warm and friendly environment.</p>
            """
          +post_title: "Fitting-out of new chic address in the heart of Lyon"
          +post_excerpt: "Tétris carries out the turnkey work on the Republik hotel in the heart of Lyon"
          +post_status: "publish"
          +comment_status: "closed"
          +ping_status: "closed"
          +post_password: ""
          +post_name: "fitting-out-of-new-chic-address-in-the-heart-of-lyon"
          +to_ping: ""
          +pinged: ""
          +post_modified: "2021-10-14 16:51:54"
          +post_modified_gmt: "2021-10-14 16:51:54"
          +post_content_filtered: ""
          +post_parent: 0
          +guid: "https://tetris-dev.ontest.net/case_study/fitting-out-of-new-chic-address-in-the-heart-of-lyon/"
          +menu_order: 0
          +post_type: "case_study"
          +post_mime_type: ""
          +comment_count: "0"
          +filter: "raw"
        }
      ]
      +post_count: 3
      +current_post: -1
      +before_loop: false
      +in_the_loop: false
      +post: WP_Post {#5118}
      +comment_count: 0
      +current_comment: -1
      +found_posts: 7
      +max_num_pages: 3
      +max_num_comment_pages: 0
      +is_single: false
      +is_preview: false
      +is_page: false
      +is_archive: true
      +is_date: false
      +is_year: false
      +is_month: false
      +is_day: false
      +is_time: false
      +is_author: false
      +is_category: false
      +is_tag: false
      +is_tax: true
      +is_search: false
      +is_feed: false
      +is_comment_feed: false
      +is_trackback: false
      +is_home: false
      +is_privacy_policy: false
      +is_404: false
      +is_embed: false
      +is_paged: false
      +is_admin: false
      +is_attachment: false
      +is_singular: false
      +is_robots: false
      +is_favicon: false
      +is_posts_page: false
      +is_post_type_archive: true
      -query_vars_hash: "df7c2c3ad25dcfa89f22a73bffa26833"
      -query_vars_changed: true
      +thumbnails_cached: false
      #allow_query_attachment_by_filename: false
      -stopwords: null
      -compat_fields: array:2 [
        0 => "query_vars_hash"
        1 => "query_vars_changed"
      ]
      -compat_methods: array:2 [
        0 => "init_query_flags"
        1 => "parse_tax_query"
      ]
    }
  ]
  "__env" => Illuminate\View\Factory {#2898}
  "app" => Illuminate\Container\Container {#2881}
  "override" => "single"
  "gdpr_prefs" => []
  "contact_url" => "https://www.tetris-db.com/en/contact-us/"
  "contact_phones" => array:14 [
    "Belgium" => array:3 [
      "code" => "be"
      "flag" => "https://www.tetris-db.com/wp-content/polylang/fr_BE.svg"
      "phone" => "+3225502617"
    ]
    "Brazil" => array:3 [
      "code" => "br"
      "flag" => "https://www.tetris-db.com/wp-content/polylang/pt_BR.svg"
      "phone" => "+55114949-6591"
    ]
    "Dubai" => array:3 [
      "code" => "ae"
      "flag" => "https://www.tetris-db.com/wp-content/polylang/ae.svg"
      "phone" => "+97144266999"
    ]
    "France" => array:3 [
      "code" => "fr"
      "flag" => "https://www.tetris-db.com/wp-content/polylang/fr_FR.svg"
      "phone" => "+33149003250"
    ]
    "Germany" => array:3 [
      "code" => "de"
      "flag" => "https://www.tetris-db.com/wp-content/polylang/de_DE.svg"
      "phone" => "+496920032000"
    ]
    "Italy" => array:3 [
      "code" => "it"
      "flag" => "https://www.tetris-db.com/wp-content/polylang/it_IT.svg"
      "phone" => "+390249536400"
    ]
    "Luxembourg" => array:3 [
      "code" => "lu"
      "flag" => "https://www.tetris-db.com/wp-content/polylang/fr_LU.svg"
      "phone" => "+35246454034"
    ]
    "Netherlands" => array:3 [
      "code" => "nl"
      "flag" => "https://www.tetris-db.com/wp-content/polylang/nl_NL.svg"
      "phone" => "+31205405405"
    ]
    "Poland" => array:3 [
      "code" => "pl"
      "flag" => "https://www.tetris-db.com/wp-content/polylang/pl_PL.svg"
      "phone" => "+48221670000"
    ]
    "Portugal" => array:3 [
      "code" => "pt"
      "flag" => "https://www.tetris-db.com/wp-content/polylang/pt_PT.svg"
      "phone" => "+351213583222"
    ]
    "South Africa" => array:3 [
      "code" => "za"
      "flag" => "https://www.tetris-db.com/wp-content/polylang/en_ZA.svg"
      "phone" => "+27105908355"
    ]
    "Spain" => array:3 [
      "code" => "es"
      "flag" => "https://www.tetris-db.com/wp-content/polylang/es_ES.svg"
      "phone" => "+34662409255"
    ]
    "Switzerland" => array:3 [
      "code" => "ch"
      "flag" => "https://www.tetris-db.com/wp-content/polylang/fr_CH.svg"
      "phone" => "+41227500680"
    ]
    "United Kingdom" => array:3 [
      "code" => "uk"
      "flag" => "https://www.tetris-db.com/wp-content/polylang/en_GB.svg"
      "phone" => "+442074934933"
    ]
  ]
  "best_contact_phone" => array:4 [
    "code" => "be"
    "flag" => "https://www.tetris-db.com/wp-content/polylang/fr_BE.svg"
    "name" => "Belgium"
    "phone" => "+3225502617"
  ]
  "show_intro" => false
  "popup" => false
  "display_breadcrumbs" => true
  "display_sidebar" => false
  "status" => "publish"
  "asset" => WP_Term {#5109}
  "client" => WP_Term {#4887}
  "industries" => array:1 [
    0 => WP_Term {#5105}
  ]
  "services" => array:1 [
    30 => WP_Term {#5094}
  ]
  "tags" => []
  "area" => "4600 sqm"
  "description" => array:2 [
    "headings" => array:2 [
      "challenge" => "Challenge"
      "solution" => "Solution"
    ]
    "texts" => array:2 [
      "challenge" => """
        \r\n
        <p>Tétris was commissioned by <a href="https://www.radissonhotels.com/en-us/" target="_blank" rel="noopener">Radisson Hotel Group</a>, a world-renowned American hotel group managing a vast portfolio of establishments, for a major project: conducting the complete renovation works of the Radisson Blu, located in the Old Port of Marseille.</p>\r\n
        <p>This colossal project encompassed the complete transformation of 189 rooms and the hotel lobby, covering a total area of 4,600 square meters.</p>\r\n
        <p>The main challenge of this project lay in its logistical complexity. Indeed, Tétris had to successfully carry out this large-scale renovation in an occupied site, while adhering to a particularly tight schedule of 5 months for the accommodation section. This time constraint demanded precise coordination and optimal efficiency at every stage of the process.</p>\r\n
        <p>The lobby, the true showcase of the hotel and the first point of contact with guests, received special attention. In this strategic space, the Tétris team deployed all its expertise in interior design. Every aspect of the renovation was meticulously studied, from coverings to lighting, including custom fittings and technical installations. Tétris's expertise was also demonstrated in the harmonious integration of furniture selected by the client, ensuring perfect coherence with all the work carried out.</p>\r\n
        """
      "solution" => """
        \r\n
        <p>To meet this space planning challenge, Tétris developed and implemented a rigorous strategy, structured around several key axes.</p>\r\n
        <p>First, a methodical phasing was established. The project was divided into five distinct work phases, allowing for a systematic approach and optimal resource allocation. This segmentation facilitated site management and minimized disruptions for hotel guests and staff.</p>\r\n
        <p>Next, Tétris implemented a continuous improvement process. At the end of each phase, the methodology underwent thorough review, improvement, and optimization. This approach increased efficiency throughout the project by capitalizing on feedback and experience.</p>\r\n
        <p>Close collaboration with partner companies played a crucial role in the project's success. Tétris established a relationship of mutual trust, fostering optimal synergy between the various teams involved. This collaborative approach helped overcome the challenges inherent to a project of this scale.</p>\r\n
        <p>The total commitment of Tétris teams and those of partners was a determining factor. All demonstrated exceptional dedication, working hand in hand to achieve set objectives, despite time constraints and project complexity.</p>\r\n
        <p>Finally, rigorous management was put in place, with constant monitoring of work progress and rapid adaptability to unforeseen circumstances. This constant vigilance ensured compliance with the project's tight deadlines.</p>\r\n
        <p>Thanks to this structured approach and Tétris' expertise in space planning, the project was completed within the allotted timeframe, strictly adhering to the initially set 5-month deadline. The successful renovation of 189 rooms and meticulous transformation of the lobby modernized the establishment while minimizing disruptions for guests and staff.</p>\r\n
        <p>This exemplary achievement highlights Tétris' expertise in managing complex hotel renovation projects, particularly in occupied site situations and within optimized timeframes. The success of this project consolidates Tétris' position as a reference partner for large-scale hotel renovations, capable of executing ambitious projects while maintaining impeccable quality standards.</p>
        """
    ]
  ]
  "table_of_contents" => array:2 [
    "challenge" => "Challenge\n"
    "solution" => "Solution\n"
  ]
  "contents" => array:2 [
    0 => """
      <h2 id="challenge" class="tab">Challenge</h2>\r\n
      <p>Tétris was commissioned by <a href="https://www.radissonhotels.com/en-us/" target="_blank" rel="noopener">Radisson Hotel Group</a>, a world-renowned American hotel group managing a vast portfolio of establishments, for a major project: conducting the complete renovation works of the Radisson Blu, located in the Old Port of Marseille.</p>\r\n
      <p>This colossal project encompassed the complete transformation of 189 rooms and the hotel lobby, covering a total area of 4,600 square meters.</p>\r\n
      <p>The main challenge of this project lay in its logistical complexity. Indeed, Tétris had to successfully carry out this large-scale renovation in an occupied site, while adhering to a particularly tight schedule of 5 months for the accommodation section. This time constraint demanded precise coordination and optimal efficiency at every stage of the process.</p>\r\n
      <p>The lobby, the true showcase of the hotel and the first point of contact with guests, received special attention. In this strategic space, the Tétris team deployed all its expertise in interior design. Every aspect of the renovation was meticulously studied, from coverings to lighting, including custom fittings and technical installations. Tétris's expertise was also demonstrated in the harmonious integration of furniture selected by the client, ensuring perfect coherence with all the work carried out.</p>\r\n
      """
    1 => """
      <h2 id="solution" class="tab">Solution</h2>\r\n
      <p>To meet this space planning challenge, Tétris developed and implemented a rigorous strategy, structured around several key axes.</p>\r\n
      <p>First, a methodical phasing was established. The project was divided into five distinct work phases, allowing for a systematic approach and optimal resource allocation. This segmentation facilitated site management and minimized disruptions for hotel guests and staff.</p>\r\n
      <p>Next, Tétris implemented a continuous improvement process. At the end of each phase, the methodology underwent thorough review, improvement, and optimization. This approach increased efficiency throughout the project by capitalizing on feedback and experience.</p>\r\n
      <p>Close collaboration with partner companies played a crucial role in the project's success. Tétris established a relationship of mutual trust, fostering optimal synergy between the various teams involved. This collaborative approach helped overcome the challenges inherent to a project of this scale.</p>\r\n
      <p>The total commitment of Tétris teams and those of partners was a determining factor. All demonstrated exceptional dedication, working hand in hand to achieve set objectives, despite time constraints and project complexity.</p>\r\n
      <p>Finally, rigorous management was put in place, with constant monitoring of work progress and rapid adaptability to unforeseen circumstances. This constant vigilance ensured compliance with the project's tight deadlines.</p>\r\n
      <p>Thanks to this structured approach and Tétris' expertise in space planning, the project was completed within the allotted timeframe, strictly adhering to the initially set 5-month deadline. The successful renovation of 189 rooms and meticulous transformation of the lobby modernized the establishment while minimizing disruptions for guests and staff.</p>\r\n
      <p>This exemplary achievement highlights Tétris' expertise in managing complex hotel renovation projects, particularly in occupied site situations and within optimized timeframes. The success of this project consolidates Tétris' position as a reference partner for large-scale hotel renovations, capable of executing ambitious projects while maintaining impeccable quality standards.</p>
      """
  ]
  "duration" => "5 months"
  "workplaces" => "189 keys"
  "testimonial" => ""
  "img_gallery" => array:16 [
    41837 => "https://www.tetris-db.com/wp-content/uploads/2025/06/tetris-db-radisson-blu-france-38741-31.jpg"
    41832 => "https://www.tetris-db.com/wp-content/uploads/2025/06/tetris-db-radisson-blu-france-38741-11.jpg"
    41843 => "https://www.tetris-db.com/wp-content/uploads/2025/06/tetris-db-radisson-blu-france-38741-42.jpg"
    41847 => "https://www.tetris-db.com/wp-content/uploads/2025/06/tetris-db-radisson-blu-france-38741-48.jpg"
    41846 => "https://www.tetris-db.com/wp-content/uploads/2025/06/tetris-db-radisson-blu-france-38741-47.jpg"
    41844 => "https://www.tetris-db.com/wp-content/uploads/2025/06/tetris-db-radisson-blu-france-38741-43.jpg"
    41845 => "https://www.tetris-db.com/wp-content/uploads/2025/06/tetris-db-radisson-blu-france-38741-45.jpg"
    41842 => "https://www.tetris-db.com/wp-content/uploads/2025/06/tetris-db-radisson-blu-france-38741-40.jpg"
    41841 => "https://www.tetris-db.com/wp-content/uploads/2025/06/tetris-db-radisson-blu-france-38741-38.jpg"
    41836 => "https://www.tetris-db.com/wp-content/uploads/2025/06/tetris-db-radisson-blu-france-38741-30.jpg"
    41838 => "https://www.tetris-db.com/wp-content/uploads/2025/06/tetris-db-radisson-blu-france-38741-33.jpg"
    41835 => "https://www.tetris-db.com/wp-content/uploads/2025/06/tetris-db-radisson-blu-france-38741-29.jpg"
    41839 => "https://www.tetris-db.com/wp-content/uploads/2025/06/tetris-db-radisson-blu-france-38741-36.jpg"
    41833 => "https://www.tetris-db.com/wp-content/uploads/2025/06/tetris-db-radisson-blu-france-38741-24.jpg"
    41840 => "https://www.tetris-db.com/wp-content/uploads/2025/06/tetris-db-radisson-blu-france-38741-37.jpg"
    41834 => "https://www.tetris-db.com/wp-content/uploads/2025/06/tetris-db-radisson-blu-france-38741-25.jpg"
  ]
  "vid_gallery" => ""
  "virtual_visit" => false
  "gallery_pos" => ""
  "loc_country_code" => "fr"
  "loc_country" => "France"
  "loc_city" => "Marseille"
  "loc_coords" => array:1 [
    0 => "43.2933908;5.3709635"
  ]
  "related_posts" => WP_Query {#5115}
  "__currentLoopData" => array:16 [
    41837 => "https://www.tetris-db.com/wp-content/uploads/2025/06/tetris-db-radisson-blu-france-38741-31.jpg"
    41832 => "https://www.tetris-db.com/wp-content/uploads/2025/06/tetris-db-radisson-blu-france-38741-11.jpg"
    41843 => "https://www.tetris-db.com/wp-content/uploads/2025/06/tetris-db-radisson-blu-france-38741-42.jpg"
    41847 => "https://www.tetris-db.com/wp-content/uploads/2025/06/tetris-db-radisson-blu-france-38741-48.jpg"
    41846 => "https://www.tetris-db.com/wp-content/uploads/2025/06/tetris-db-radisson-blu-france-38741-47.jpg"
    41844 => "https://www.tetris-db.com/wp-content/uploads/2025/06/tetris-db-radisson-blu-france-38741-43.jpg"
    41845 => "https://www.tetris-db.com/wp-content/uploads/2025/06/tetris-db-radisson-blu-france-38741-45.jpg"
    41842 => "https://www.tetris-db.com/wp-content/uploads/2025/06/tetris-db-radisson-blu-france-38741-40.jpg"
    41841 => "https://www.tetris-db.com/wp-content/uploads/2025/06/tetris-db-radisson-blu-france-38741-38.jpg"
    41836 => "https://www.tetris-db.com/wp-content/uploads/2025/06/tetris-db-radisson-blu-france-38741-30.jpg"
    41838 => "https://www.tetris-db.com/wp-content/uploads/2025/06/tetris-db-radisson-blu-france-38741-33.jpg"
    41835 => "https://www.tetris-db.com/wp-content/uploads/2025/06/tetris-db-radisson-blu-france-38741-29.jpg"
    41839 => "https://www.tetris-db.com/wp-content/uploads/2025/06/tetris-db-radisson-blu-france-38741-36.jpg"
    41833 => "https://www.tetris-db.com/wp-content/uploads/2025/06/tetris-db-radisson-blu-france-38741-24.jpg"
    41840 => "https://www.tetris-db.com/wp-content/uploads/2025/06/tetris-db-radisson-blu-france-38741-37.jpg"
    41834 => "https://www.tetris-db.com/wp-content/uploads/2025/06/tetris-db-radisson-blu-france-38741-25.jpg"
  ]
  "title" => "Solution\n"
  "slug" => "solution"
  "loop" => null
  "service" => WP_Term {#5094}
  "key" => 30
  "content" => """
    <h2 id="solution" class="tab">Solution</h2>\r\n
    <p>To meet this space planning challenge, Tétris developed and implemented a rigorous strategy, structured around several key axes.</p>\r\n
    <p>First, a methodical phasing was established. The project was divided into five distinct work phases, allowing for a systematic approach and optimal resource allocation. This segmentation facilitated site management and minimized disruptions for hotel guests and staff.</p>\r\n
    <p>Next, Tétris implemented a continuous improvement process. At the end of each phase, the methodology underwent thorough review, improvement, and optimization. This approach increased efficiency throughout the project by capitalizing on feedback and experience.</p>\r\n
    <p>Close collaboration with partner companies played a crucial role in the project's success. Tétris established a relationship of mutual trust, fostering optimal synergy between the various teams involved. This collaborative approach helped overcome the challenges inherent to a project of this scale.</p>\r\n
    <p>The total commitment of Tétris teams and those of partners was a determining factor. All demonstrated exceptional dedication, working hand in hand to achieve set objectives, despite time constraints and project complexity.</p>\r\n
    <p>Finally, rigorous management was put in place, with constant monitoring of work progress and rapid adaptability to unforeseen circumstances. This constant vigilance ensured compliance with the project's tight deadlines.</p>\r\n
    <p>Thanks to this structured approach and Tétris' expertise in space planning, the project was completed within the allotted timeframe, strictly adhering to the initially set 5-month deadline. The successful renovation of 189 rooms and meticulous transformation of the lobby modernized the establishment while minimizing disruptions for guests and staff.</p>\r\n
    <p>This exemplary achievement highlights Tétris' expertise in managing complex hotel renovation projects, particularly in occupied site situations and within optimized timeframes. The success of this project consolidates Tétris' position as a reference partner for large-scale hotel renovations, capable of executing ambitious projects while maintaining impeccable quality standards.</p>
    """
  "i" => 1
  "first_photo_id" => 41834
  "first_photo" => "https://www.tetris-db.com/wp-content/uploads/2025/06/tetris-db-radisson-blu-france-38741-25.jpg"
  "img_src" => "https://www.tetris-db.com/wp-content/uploads/2025/06/tetris-db-radisson-blu-france-38741-25.jpg"
  "img_id" => 41834
  "img" => array:4 [
    0 => "https://www.tetris-db.com/wp-content/uploads/2025/06/tetris-db-radisson-blu-france-38741-25.jpg"
    1 => 1024
    2 => 683
    3 => false
  ]
]