Client story

Office renovation

Size

13600 sqm

Duration

13 months

Approx.

1132 workplaces

Project's presentation

Arrangement of space for TUiR Allianz Polska S.A. in the TOPAZ 1 office building in Warsaw included disassembly, installation work, renovation, arrangement, assembly and finishing works. The renovation covered the existing office space, which required the coordination of works in such a way that the impact on the Allianz employees was as small as possible.

We'd love to hear from you

Get in Touch